Customization: | Available |
---|---|
Production Scores: | Multiple Varieties |
Production Continuity: | Continuous |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
• Professionally used for solar cell automatic welding in layup process with high degree of automation and stable performance;
• Applied for half-cut cell modules, tr modules, all black modules and three/quadrant modules(5BB-20BB);
• The whole bus lines have welding heads, and is compatible with all kinds of bus lines when the cell size is not changed and there is no need to change the welding head;
• The welding adopts digital communication flexible closed-loop control mode, which can feed back the welding situation in real time and control the welding quality effectively;
• The information display system equipped by default has working cycle statistics, fault classification and downtime statistics, and can automatically generate production capacity, fault time and fault classification proportion graphics and data reports through the computer, to intuitively analyze and control the operation status of the equipment;
• Independent mechanism of modularization can effectively save the switching time between different solar cells.
Equipment Parameter
Type | Overall Dimensions mm (Length*Width*Height) | Weight T(±5%) | Installed Power KW | Working Cycle | Fragmentation Rate | Air Source Requirements Mpa | Compatibility |
DHJ-G220 | 5110×4720×2180 (Including alarm light, with a height of 2480mm) | 7 | Peak value 35KW,average 15KW | Half piece≤16s Jumper wire≤21s |
≤0.02% | 0.5-0.8Mpa | Jumper and half piece module |
Assembly Line Project
Customers' Plants
Southeast Asia, East Asia, Africa, Europe, North America, South America
Q1. What is the payment term?
A: TT or L/C. The payment can be communicated by both side, and will be performed accoeding to contract.
Q2. What is the delivery time?
A: 45 days after advanced payment in general.
Q3. Shall I make my own brand?
A: Sure. The logo and brand can be design.
Q4. How to visit our company?
A: To Beijing airport, and by high speed train from Bejing to Qinhuangdao(1 hour). Welcome to make an appointment and we will pick you up.